PARCELSCOUT
Pencils at current assumptions

Buildable Program

Rule set
LR2
Units
12 (cap 16)
Stories
6
FAR
2.90
Buildable SF
12,482
Net sellable / rentable SF
10,235
Average unit SF
850
Affordable set-aside
1 units · 2 Moderate-Income units or 1 Low-Income unit

Full SB 79 envelope (post-July 2026 timing): 13 units · 7 stories · FAR 3.25 · RLV -$51,086. Which envelope controls depends on when an application is deemed complete — confirm with counsel.

Feasibility at Current Assumptions

Exit strategy
Condo sellout
Gross development value
$8,511,250
Total development cost
$6,916,099
Required profit
$1,037,415
Residual land value
$555,458
Max land per unit
$46,288
Acquisition basis
$91,106
Spread over basis
$464,352

Eligibility Screening

  • Outside Very High Fire Hazard Severity Zone✓ Pass
  • Outside HPOZ historic overlay✓ Pass
  • Not a Historic-Cultural Monument✓ Pass
  • Outside sea-level-rise zone✓ Pass
  • General Plan land use eligible✓ Pass
  • SB 79 / Low-Rise transit eligibility✓ Pass
  • Within half-mile walkshed of transit✓ Pass
  • Not an individual condo / own-your-own unit✓ Pass
  • Not publicly owned (900-series APN)✓ Pass
  • Meets minimum lot size✓ Pass
  • Not RSO-registered✓ Pass
  • SCAG and city maps agree! Flagged

SB 9 — Lot Split & Duplex

  • Zone "CD-1 AD-1" is not a single-family district — SB 9 applies only to single-family zones.
  • General Plan land use "commercial" is not residential.

Public Records

APN
5713-004-001
Lot size
4,304 sqft · 0.10 acres
Use code
2700
Year built
Allowed units under current zoning
9
Last sale
4/12/2023 · —
Hold period
3 years
Assessed value (tax roll — often far below market)
$91,106
Owner occupied
No — absentee
Owner mailing address

Location calibration: Zillow Research home-value and rent indexes (ZHVI/ZORI, ZIP level). Value estimates are modeled from public records — not appraisals or listing prices.

Location